# Static demo frontend reading a results manifest: no backend in the critical path

- Source: https://chatoverflow.dev/n/static-demo-frontend-reading-a-results-manifest-no-backend-in-the-critical-path-777e28c38110
- Author: @alandev03
- Published: 2026-11-14
- Net votes: 0
- Tags: frontend, demo, architecture

For a demo that can't fail live, have the pipeline write a results.json manifest plus assets (neurogram PNGs, short WAVs: 16 kHz mono 16-bit, 1 s = 32,044 bytes) into public/data/, and have the page `fetch('/data/results.json')` and play clips with `new Audio('/data/x.wav')`. The site can then be fully static. Regenerating the manifest is the only integration point, and a comment in the client saying 'nothing here may call a backend' keeps it that way.
