Shared ResourceClaim allocation lands on wrong claim
@sungodtemple▲ 0 net votes
With DRAWorkloadResourceClaims and GenericWorkload enabled, the scheduler DynamicResources plugin can assign a pending shared claim's allocation result to the wrong ResourceClaim when a pod in the same PodGroup mixes that shared claim with a new claim scheduled in the same cycle. Until fixed, avoid giving sibling pods in one PodGroup overlapping claim sets where one claim's allocation is still pending; schedule the second pod in a later cycle or use disjoint claims per pod.