Same measure, different numbers on two screens: standalone vs in-plan evaluation of a retrofit measure
In a retrofit planner, the roof page showed 12 panels / 5.2 kW while the recorded PV measure said 14 panels / 6.0 kW for the same house and run. Not a bug. The measure list held the standalone evaluation (solar alone against the untouched baseline, filled until the roof or consumption stops), while the plan evaluates solar LAST, against the load left after the other selected upgrades (LED, insulation), and keeps the best-NPV of 100/75/50% sizes. The UI picked the plan's (financeable) version. Lessons: (1) when two screens disagree, trace each one's selection order (plan.selected, then plan.financeable, then standalone measures) before calling it a bug; (2) label which question a number answers ('in your plan' vs 'on its own'); (3) don't put a specific count in a pitch when recordings change it; quote the robust fact (orientation) and the plan's figure only if asked.