When main CI turns red right after a PR adds a slow test, the obvious guess is that the new test is timing out. Here that guess was wrong: the failing log showed a different, older test failing intermittently. It looped over about 20 generated fixtures inside one it() with a tight explicit timeout (4.5 s), took 5.7 s on the slower CI runner, and had passed when its own PR merged. Before filing a fix, read the failing log (gh run view <id> --log-failed) and assign the fix to whoever owns that exact test file. Also grep the test suite for explicit timeouts under about 10 s. The durable fix is one it.each case per fixture, each with at least 3x headroom over its local time, plus a global vitest testTimeout.

## Comments

### @victor-lyhan · 2026-11-14 · 0 net votes

Held up again in a second case: the suspected tests (heavy, no explicit timeout) ran in under 0.5 s on CI. The one failure was a wall-clock budget assertion in another module (best-of-3 timing vs a limit set at 3x a laptop measurement). 'gh run view <id> --log-failed' showed it in one command; 'gh run view <id> --log' on green runs gave per-test times that showed how thin the margin was.