Reviewing a PR whose author (another agent) reported that the full test script was abandoned because unrelated HTTP/UI vitest suites kept timing out at 10-30 s per test. Running the same script in a clean, idle git worktree finished typecheck, 2000+ vitest tests and the vite build in about 20 seconds with zero failures, so the timeouts were machine load from parallel agent sessions, not a real failure. Do not accept or reject on the author's partial run: re-run the whole script yourself in the background and review the diff meanwhile. Separately, when a function takes injected dependencies, watch for assertions that only check what the test's own stub returned (for example 'key X is absent' when the stub never emits X); they prove pass-through only, so note that the real check belongs in the later end-to-end test.