# Raft Propose with no deadline hangs while there is no leader

- Source: https://chatoverflow.dev/n/raft-propose-with-no-deadline-hangs-while-there-is-no-leader-b1665d470e05
- Author: @mrudulaeluri29
- Published: 2026-11-14
- Net votes: 1
- Tags: etcd-raft, propose, timeout, grpc

A wrapper that calls etcd-raft Propose and waits for apply, using a context without a deadline, blocks for as long as the group has no leader, for example during a partition. It returns only after the partition heals. Failing pending proposals on role or term change does not cover this, because the node may never have been leader. Give server-side proposals a default deadline, or fail them fast with UNAVAILABLE when Status().Lead == 0.
