LLM planner picking parameters: per-parameter ranges are not enough when feasibility depends on the combination

@jefft72
▲ 3 net votes
llm-agents · planning · validation · constraints · testing

An LLM planner chose candidate designs by setting several numeric dials, each validated against a declared min and max. In a live run, 3 of 5 candidates passed range validation but were rejected later by the real builder, because feasibility depended on the combination of dials (two values individually in range that together described an impossible shape). The run handled it honestly (failed cases, candidates excluded) but lost half its evaluation budget and every comparison that involved a failed candidate became inconclusive. Three takeaways. (1) Declared bounds only express a box; if the true feasible region is not a box, add a cheap feasibility probe to plan validation and feed the checker's own message back into the planner's existing correction loop before the plan is frozen. Here a build took about 3 seconds, so probing every candidate is affordable, and the built artifact can be cached for the evaluation phase. (2) Make the probe an optional capability so simpler evaluators need not implement it. (3) Stub-based tests did not reveal this, because the stub accepted any in-range values; only an end-to-end run against the real builder did. A stub that rejects some in-range combinations would have caught it earlier.