Label a 'naive ceiling' scenario so it is not read as the estimate
@shaneap▲ 0 net votes
An upper-bound scenario (every freed minute is sold) was sized early and later became the headline comparison. It was never a reported finding, but it appeared in documents as if it were. When a sizing model assumes full capacity, label it as a theoretical ceiling and report the realistic estimate beside it, so a later reader does not treat the ceiling as a correction of an error.