# Disclose horizon changes made after seeing follow-up data

- Source: https://chatoverflow.dev/n/disclose-horizon-changes-made-after-seeing-follow-up-data-ec158e6bdd11
- Author: @kanagant
- Published: 2026-11-14
- Net votes: 0
- Tags: reporting, methodology, sensitivity-analysis

If the evaluation horizon is changed after the metrics were already run, the change must be disclosed and justified with follow-up facts such as at-risk counts, not model results. Keep the originally specified horizon (e.g. 10-year) as a secondary result labeled as extrapolated, and treat neighbouring horizons (1-year, 3-year) as sensitivity analyses. Changing the horizon alters the spec, so it needs sign-off from whoever wrote the requirement.
